Soil Cells Support Basement...

Soil Cells Support Basement Trees in Western Australia

By Kristyn Maslog-Levis

basement trees in western australia

When landscape architecture company, Plan E, needed a system that would sustain large trees in the basement of a car park, they decided to turn to the Citygreen® modular Stratacell™ system.

The 20 Points Way Cockburn Central project in Western Australia started in 2010 and required Plan E to plant large trees in the basement car park which would pop up through voids into the public plaza above.

stratacell installation

“We thought the Stratacells would give the trees the best chance of survival by maximising the volume of soil available to them,” says Caitlin Bell, landscape architect from Plan E.

The Stratacells structural soil cells, manufactured from 100 per cent recycled polymer, can be assembled to form a skeletal matrix that supports pavement and traffic loads. This features almost five times more available growing media compared to the traditional rock/soil method, therefore facilitating healthy root growth. Because of its high structural integrity, these matrices can be used beneath trafficked areas.

stratacell installation in western australia

Cockburn Central is a landmark development of quality apartment living with an exciting mix of shops, eateries and businesses centred around the Town Square. This booming urban community is only 16 minutes away by train from Perth CBD and a short drive from Fremantle.

The project had a landscape budget of $700,000 and was completed in 2012. The Housing Authority of Western Australia was the developer for the said project, while Probuild was the principal contractor/builder.

western australia basement trees
Caitlin said they had an initial bump in the process, as not a lot of construction contractors are familiar with the Citygreen Stratacell system. However, they found that the installation was quite straightforward and easy to do with the support provided by the Citygreen staff to resolve any site issues they had.

basement trees using stratacell

Jason Royal from consulting arborist, Arborlogic, initially provided the details of the Stratacell system to Plan E but was not involved with the design process. However, he visited the site to see the installation of the system out of his own curiosity and found that it was very easy and uncomplicated to use.

Chris Aylin, from Gregory Aylin Contracting company, was also impressed by the ease of installation and the support given by Citygreen.

During the entire project, Caitlin said the biggest issue they faced had nothing to do with the Stratacells themselves. The trickiest bit involved craning the trees into position in the car park.

Since the 12 months after the project finished, Caitlin said they have not seen any issues with the system and in fact, the trees are flourishing. Jason from Arborlogic also visited the site, again out of his own curiosity, and found it satisfactory.

“I saw the trees recently and they looked like they were in good health,” Jason says. If the opportunity arises, he says he will use the system again.

Although it was the first time Plan E has used the Citygreen Stratacell system, they were very impressed with the product and how well it fits with the overall design of the project. Since then, they’ve used the Stratacells on other projects and have even specified the product for further upcoming projects they have.

 

“Great customer service, quick response times and a very in depth QA system with constant support.”

- Laura Wiesenekker, Project Engineer, Densford Civil -

“Citygreen is a very professional  business, and I found everything was great in terms of deliveries, product supply and information. It was all forthcoming and helped us to complete the project.”

- Keith Burns, Architect/Designer, Keith Burns Architect -

“Citygreen offered training and invaluable technical assistance during the works.”

- James Callan, Estimating Manager, Complex Co Pty Ltd -

“Our experience, in working with a Citygreen Design Studio was second to none. We found responses from the design studio to be very timely, and technically thorough. We went backwards and forwards a number of times, looking at different iterations of the design and, nothing was too much trouble to examine and explore different possibilities. I would highly recommend the Citygreen Design Studio to any future client considering using your services.”

- Sandra Smith, Principal Landscape Architect, City Of Monash -

“We are big on compliance on all projects, and the fact that their SmartCertify cloud platform covers all bases, and supports their 20 year warranties, is critical – especially that these pits are being installed under roadways and footpaths.”

- Johny Purkaystha, Civil Program Engineer, Central Coast Council -

"I reviewed all the previous projects that we have installed in the past couple years using your product and I can happily report back that we have 0% mortality in the soil cells, which is incredible!"

- Brendan Wilton, CEO, Trim Landscaping, Bedford, Canada -