Sheraton Park, Doha

Sheraton Park, Doha

Platipus Case Study Sheraton Park Doha 02 trees Citygreen

Project Specification

This development creates a renewed public green space covering the area from the Doha Bay to the Sheraton Hotel. The project included the design and creation of a public park and a two-story underground car park accommodating around 2,000 vehicles.

Platipus Case Study Sheraton Park Doha 01 trees Citygreen

Platipus underground Rootball Fixing Deadman Systems were specified in order to provide not only a clean and safe finish to the public space but also to secure these transplanted, mature palms in their concrete planting pits without jeopardizing the water proofing that protects the underground car park beneath. Platipus provided on-site training and installation advice.

Tree Anchoring Systems: Deadman System -Plati-Mat & Strap (RF2RDMP & RF2RDMS)

Platipus Case Study Deadman System 1 trees Citygreen Platipus Case Study Deadman Fixing System Strap trees Citygreen

“Great customer service, quick response times and a very in depth QA system with constant support.”

- Laura Wiesenekker, Project Engineer, Densford Civil -

“Citygreen is a very professional  business, and I found everything was great in terms of deliveries, product supply and information. It was all forthcoming and helped us to complete the project.”

- Keith Burns, Architect/Designer, Keith Burns Architect -

“Citygreen offered training and invaluable technical assistance during the works.”

- James Callan, Estimating Manager, Complex Co Pty Ltd -

“Our experience, in working with a Citygreen Design Studio was second to none. We found responses from the design studio to be very timely, and technically thorough. We went backwards and forwards a number of times, looking at different iterations of the design and, nothing was too much trouble to examine and explore different possibilities. I would highly recommend the Citygreen Design Studio to any future client considering using your services.”

- Sandra Smith, Principal Landscape Architect, City Of Monash -

“We are big on compliance on all projects, and the fact that their SmartCertify cloud platform covers all bases, and supports their 20 year warranties, is critical – especially that these pits are being installed under roadways and footpaths.”

- Johny Purkaystha, Civil Program Engineer, Central Coast Council -

"I reviewed all the previous projects that we have installed in the past couple years using your product and I can happily report back that we have 0% mortality in the soil cells, which is incredible!"

- Brendan Wilton, CEO, Trim Landscaping, Bedford, Canada -